共79个搜索结果:

HTS Number Description Unit of Quantity General Rate of Duty Details
4418 4000.00 Formwork (shuttering) for concrete constructional work kg 3.2% More
4418 5000 Shingles and shakes Free
4418 5000.10 Of western red cedar square/ kg More
4418 5000.30 Other square/ kg More
4418 5000.50 Other square/ kg More
4418 6000.00 Posts and beams kg 3.2% More
4418 73 Of bamboo or with at least the top layer (wear layer) of bamboo:
4418 7310.00 Solid m2 Free More
4418 7320.00 Having a face ply more than 6 mm in thickness m2 Free More
4418 7330.00 Other m2 8% More
4418 7340.00 Having a face ply more than 6 mm in thickness m2 3.2% More
4418 7360.00 Of unidirectional bamboo m2 Free More
4418 7370.00 Other m2 5% More
4418 7390.00 Other m2 3.2% More
4418 74 Other, for mosaic floors:
4418 7410.00 Solid m2 Free More
4418 7420.00 Having a face ply more than 6 mm in thickness m2 Free More
4418 7490.00 Other m2 8% More
4418 75 Other, multilayer:
4418 7540.00 Having a face ply more than 6 mm in thickness m2 3.2% More